Lake Bonney 2 SA, Australia
Lake Bonney stage 2 commenced full commercial operation in September 2008 with a total installed capacity of 159MW and a net capacity factor of 34%. Lake Bonney stage 2 comprises 53 Vestas V90 3.0MW wind turbines. It is located on the Woakwine Range, about 2km from the eastern shore of Lake Bonney, near Millicent in South Australia.
|
|
|
Revenue
assurance
|
Market (with potential to contract energy and/or RECs at a future time.
|
|
Customers
|
N/A
|
|
Operation
|
A five-year Warranty, Operations and Maintenance Agreement with Vestas
|
|
Land
|
Land leases with a 40-year minimum term.
|
|
Regulatory
regime
|
Australian MRET Scheme
|
|